When I purchased the hotel in 2019, I knew the buildings needed extensive repairs. In Spring 2020 we fixed some issues that were in dire need of fixing before we could reasonably open up for the summer of 2020. This was mostly limited to windows that were just completely broken.
As you can imagine it was pretty nerve wracking for me to be spending money not knowing if we would have any summer at all with the Corona issue. See the pictures of what we did!
Staging set up so that we could replace the bathroom window in 42B.
The windows on the top floor (42B) were all broken and not really even going up and down. This was the first set of windows we replaced.
Inside view from the kitchen of 42B.
Window being replaced in kitchen 42B. Notice how there was absolutely no insulation in the wall at all!
Replaced bathroom window in 42D. Back in April it simply fell out of its home it was so rotted :).
A look at what the old windows in 42B looked like at the start of renovations.
We are using premium Andersen 200 series windows throughout the units where possible.
Replaced the window for the bathroom in 42A. again, this was another window that was not even functioning.
We replaced the windows in the front bedroom of 42B as well as insulated all the walls.
Another picture of bedroom in 42B
My buddy Scotty replacing rotted out soffit box on the back of 42C/D. This is a temp fix for now.